Large Cresting Ridge Cap
Available Materials
Copper
Installation:
- Install “Z” strip on left and right sides of ridge
- Using 1 1/2″ stainless steel screws to fasten to roof
- Install support bracket at two farthest most ends, then space every 24″ O.S., with one laying out on every ridge seam for support
- Recommended overlap of ridge cap is 3″
- Secure copper support to “Z” strip with copper rivets provided
- Install copper ridge on supports
- Open hem on ridge is accepted in copper “Z” strip, needs to be closed with hand seamers
- Secure ridge to copper supports with copper rivets as necessary
- Copper ridge will need to be turned down at gable ends for closure